Company Homepage Tv & Film Studios Theatres Conference Centres
Home Our Services Case Studies Products Reference List Blank Boxes
 

National Theatre, Doha Qatar DOHA QATAR


LSI Projects with local partners MDS in Doha were contracted for the complete Technical Refurbishment of the 1980s built Qatar National Theatre.
The fast track refurbishment was completed in the latter part of 2004 and included the Supply, installation and Commissioning of new stage engineering, stage lighting, sound, video projection and communications systems.

The Project:

Client National Council for Culture and Heritage
Theatre Consultants : ACT Consultants Ltd - UK
Start Date : March 2004
Finish Date : September 2004

 

Under Construction
Main Foyer

 

Deliveries Begin
May 2004

EQUIPMENT SUPPLIED & INSTALLED

LIGHTING:

Top of the range ADB Phoenix 10 lighting Console
Digital Plug - In Dimmer system
Over 150 Theatre Luminaires
A Working light, House light and Motor Control System

Phoenix 10
Lighting Control Console

SOUND:

Allen & Heath 32 and 24 channel mixers
Labgruppen amplifiers
L Acoustics loudspeaker system

Control console Fully Populated Equipment Racks

 

 

EQUIPMENT SUPPLIED & INSTALLED

STAGE ENGINEERING:
New stage orchestra pit elevator
A revolving stage
8 motorised bars,
36 counterweighted BARS

Installation Of Counterweight Systems


PROJECT MANAGEMENT & INSTALLATION
On - site Project Management and over 100 installation staff were provided by LSI Projects. This included both electrical and mechanical installation for all Production related equipment including Lighting, Sound, Stage Engineering and all related electrical distribution/patch panels.

Positioning of equipment racks Power and patch panels

 

PROJECT COMPLETION

COMMISSIONING:
All Systems were commissioned during September/October ready for the first performance on 12th December 2004.